170132611178 finished at 29-Jul-07 20:30:00 BST so I guess that AS had to adjust the lead time to ensure it was placed.
And the winner appears to be a snipper - his bids are always in the last 10 secs (eg. 110138153265) so you were probably out-sniped rather than reacted to.
So, rather than give up on AS, understand how it works and work within those constraints. If you can snipe manually then do so and save money - if not then let AS do the work and make sure you bid high enough to win!
R2